
SAP C_TS422_1909 Exam Dumps [2021] Practice Valid Exam Dumps Question
C_TS422_1909 Dumps - Grab Out For [NEW-2021] SAP Exam
SAP C_TS422_1909 Exam Description:
The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
| Capacity Planning in SAP S/4HANA 8% - 12% | Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics. |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Introduction to SAP S/4HANA Supply Chain Planning < 8% | Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy. |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
C_TS422_1909 Exam Certification Details:
| Languages: | German, English, French, Chinese |
| Exam: | 80 questions |
| Duration: | 180 mins |
| Sample Questions: | SAP C_TS422_1909 Exam Sample Question |
| Cut Score: | 55% |
| Level: | Associate |
NEW QUESTION 46
Which of the following functions can be performed when the production order has the status "Created" (CRTD)?
Please choose the correct answer.
Response:
- A. A user can schedule a background job to release production orders (transaction COOIS).
- B. A user trigger printing of shop floor paper manually (transaction CO02).
- C. A user can trigger material staging via mass processing (transaction COHV).
- D. A user trigger material availability check via mass processing (transaction COHV)
Answer: B
NEW QUESTION 47
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
Response:
- A. MRP Live can propose alternative solutions
- B. MRP Live can create production orders automatically
- C. MRP Live can priorities demand from sales orders
- D. MRP Live can plan materials with recursive BOMs
Answer: A
NEW QUESTION 48
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Material master
- C. Contract
- D. Production plant
Answer: C,D
NEW QUESTION 49
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Process order
Control recipe
PI sheet
Process message - B. Process message
Control recipe
Process order
Process message
PI sheet - C. Process order
Control recipe
Process message
PI sheet - D. Control recipe
Process order
PI sheet
Answer: A
NEW QUESTION 50
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
- A. Work center hierarchy
- B. Lot sizes
- C. BOM status
- D. Validity dates
- E. Task list group number
Answer: B,C,D
NEW QUESTION 51
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.
- A. Model a separate resource in the production data structure.
- B. Model a transportation resource in the location master.
- C. Model a handling resource in the location master and goods receipt time in the mater all master.
- D. Model a resource inbound in the location master.
Answer: B,C
NEW QUESTION 52
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of cost collectors?
There are 2 correct answers to this question.
Response:
- A. They can be applied to make-to-stock production order.
- B. They can be used for manufacturing with collective orders.
- C. They can be used for repetitive manufacturing.
- D. They can be created automatically during month end process.
Answer: A,C
NEW QUESTION 53
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Response:
- A. Define order-type-dependent parameter
- B. Define production scheduling profile
- C. Define selection profiles
- D. Define scheduling parameters for production orders
Answer: A
NEW QUESTION 54
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
- A. With respect to a common key date for product and each assembly
- B. With respect to defined separate key dates for product and each assembly
- C. With respect to a common change status for product and each assembly
- D. With respect to a defined separate change status for product and each assembly
Answer: B
NEW QUESTION 55
A material has been set up as a phantom assembly by entering the special procurement key in the material master. How can you switch off the phantom assembly in a specific bill of material(BOM)?
- A. Change the item category of the phantom assembly in the BOM.
- B. Change the phantom item indicator for the phantom assembly in the BOM.
- C. Change the special procurement key of the phantom assembly in the BOM.
- D. Change the explosion type of the phantom assembly in the BOM.
Answer: D
NEW QUESTION 56
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
- A. Purchasing Info Record
- B. Production Version
- C. Contract
- D. Selection Method
Answer: B
NEW QUESTION 57
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
- B. The new operation is inserted at the desired time the previously dispatched operation is moved backward.
- C. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
- D. The previously dispatched operation stays as is the new operation is inserted after the dispatched operation.
Answer: B
NEW QUESTION 58
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?
- A. It is converted into a reservation.
- B. It is converted into a schedule line.
- C. It is converted into a planned order.
- D. It is converted into a production order.
Answer: A
NEW QUESTION 59
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 correct answers to this question.
- A. Adjust the available capacity.
- B. Execute a new production planning run.
- C. Select an alternative mode on a resource.
- D. Reduce the planning window.
- E. Form optimum sequences to reduce setup times.
Answer: A,C,E
NEW QUESTION 60
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
- A. Material Master -> MRP Group -> Plant Settings
- B. Plant Settings -> MRP Group -> Material Master
- C. Material Master -> Plant Settings -> MRP Group
- D. MRP Group -> Material Master -> Plant Settings
Answer: A
NEW QUESTION 61
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
- A. Concur
- B. SAP Fieldglass
- C. SAP Visual Enterprise
- D. SAP Hybris
- E. SAP Human Capital Management
Answer: A,B,D
NEW QUESTION 62
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:
- A. Make-to-order production (20)
- B. Planning without final assembly (50)
- C. Production by lot size (30)
- D. Planning with final assembly (40)
Answer: B
NEW QUESTION 63
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:
- A. Process instructions
- B. Batch where-used list
- C. Batch determination selection conditions
- D. Receiver-sender relationships
Answer: B,D
NEW QUESTION 64
What is the first step in the MRP run?
Please choose the correct answer.
Response:
- A. Net requirements calculation
- B. Lot size calculation
- C. Source determination
- D. BOM explosion
Answer: A
NEW QUESTION 65
......
C_TS422_1909 Exam Dumps PDF Guaranteed Success with Accurate & Updated Questions: https://www.itcertmagic.com/SAP/real-C_TS422_1909-exam-prep-dumps.html