
Oct-2021 Latest ITCertMagic C_TS422_1909 Exam Dumps with PDF and Exam Engine Free Updated Today!
Following are some new C_TS422_1909 Real Exam Questions!
NEW QUESTION 21
Which of the following are capabilities of multidimensional reporting in SAP S/4HANA embedded analytics?
There are 3 correct answers to this question.
Response:
- A. Filters
- B. Sort
- C. Drilldown
- D. Forecast
- E. Scheduling
Answer: A,B,C
NEW QUESTION 22
A resource was created in SAP S/4HANA PP/DS through the internal CIF integration and named
"W1904_1000_001". What does the suffix 001 in the resource name represent?
Please choose the correct answer.
Response:
- A. Available capacity version
- B. Number of individual capacities
- C. Work center category
- D. Capacity category
Answer: D
NEW QUESTION 23
What new technology is used in SAP S/4HANA Embedded Analytics?
Please choose the correct answer.
Response:
- A. Multidimensional Reporting client (MDRC)
- B. Smart Business Cockpit
- C. HANA Live
- D. ABAP Managed Core Data Services (CDS)
Answer: D
NEW QUESTION 24
What are prerequisites for using batch derivation?
There are 2 correct answers to this question.
Response:
- A. Receiver-sender relationships
- B. Batch determination selection conditions
- C. Process instructions
- D. Batch where-used list
Answer: A,D
NEW QUESTION 25
What are some uses for the low-level code assigned to each material? Note: There are 2 correct answers to this question.
- A. It is used by ATP to determine the priority of alternative components.
- B. It is used in MRP to determine the sequence in which materials are planned.
- C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
- D. It is used by product costing to determine how costs are rolled up.
Answer: B,D
NEW QUESTION 26
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run PP/DS heuristics for repetitive manufacturing.
- B. Run MRP with quota arrangement.
- C. Run MRP with automatic selection of production version.
- D. Assign planned orders manual lying the planning table.
Answer: A,B
NEW QUESTION 27
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?
- A. When the MRP results are saved
- B. When you create a sales order
- C. When you create a planned order
- D. When you deliver a sales order
Answer: B
NEW QUESTION 28
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- B. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
- C. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- D. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
Answer: A
NEW QUESTION 29
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production flow happens only in physically connected tanks?
- A. Work center hierarchy
- B. Operation network
- C. Resource network
- D. Setup matrix
Answer: A
NEW QUESTION 30
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.
- A. Order-related
- B. Milestone-related
- C. Cost-related
- D. Product-related
Answer: A,D
NEW QUESTION 31
Which materials have a negative quantity in a bill of materials or in a recipe? Note: There are 3 correct answers to this question.
- A. Continuous flow materials
- B. Co-products
- C. Waste products
- D. By-products
- E. Bulk materials
Answer: B,C,D
NEW QUESTION 32
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?
- A. Top of Red
- B. Top of Yellow
- C. Top of Red Base
- D. Top of Green
Answer: D
NEW QUESTION 33
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
Response:
- A. Advances in the three-tier architecture approach
- B. Wide adoption of web standards such as Service oriented architecture
- C. Capability to add to server landscape and scale
- D. Big and affordable memory
- E. Multi core processors enabling parallelism of tasks
Answer: C,D,E
NEW QUESTION 34
Advanced Planning uses master data and transaction data from SAP S/4HANA In which data obje can you set the advanced planning flag? Note: There are 2 correct answers to this question.
- A. Material
- B. Plant
- C. Production version
- D. Work center
Answer: A,D
NEW QUESTION 35
When do you use variant bills of materials (BOMB)?
- A. When multiple material also have the same BOM
- B. When a material has a configurable BOM
- C. When multiple material is have similar BOMB
- D. When a material has multiple BOMB
Answer: A
NEW QUESTION 36
Which of the following processes lead to an entry in the MRP planning file? Note: There are 3 correct answers to this question.
- A. Creation of a purchasing contract
- B. Change of the storage bin
- C. Creation of dependent requirements
- D. Creation of a sales order
- E. Change of the material's procurement type
Answer: C,D,E
NEW QUESTION 37
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Partial conversion
- B. Order release
- C. Individual conversion
- D. Full conversion
Answer: A,D
NEW QUESTION 38
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Material Requirements Planning (MRP)
- C. Capacity Requirements Planning (CRP)
- D. Integrated Business Planning (IBP)
Answer: A,D
NEW QUESTION 39
What are main innovations in manufacturing in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
- A. Monitor Production Orders Fiori app
- B. Rough-cut capacity planning
- C. Lock-free inventory movements
- D. Material Coverage Fiori app
- E. Flow manufacturing
Answer: A,C,D
NEW QUESTION 40
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. By period
- B. By material type
- C. By industry
- D. By plant
Answer: A,D
NEW QUESTION 41
Which master data object governs the relationship between supply source and demand source in the Kanban process?
- A. Control cycle
- B. Production supply area
- C. Rate routing
- D. Replenishment strategy
Answer: A
NEW QUESTION 42
Which of the following is a valid sequence of the main activities in product on order processing?
- A. Creation, staging, release, material withdrawal, confirmation
- B. Creation, scheduling, release, variance calculation, confirmation
- C. Creation, scheduling, release, material withdrawal, confirmation
- D. Creation, release, scheduling, material withdrawal, confirmation
Answer: C
NEW QUESTION 43
......
Resources From:
- 2021 Latest ITCertMagic C_TS422_1909 Exam Dumps (PDF & Exam Engine) Free Share: https://www.itcertmagic.com/SAP/real-C_TS422_1909-exam-prep-dumps.html
Free Resources from ITCertMagic, We Devoted to Helping You 100% Pass All Exams!