NEW QUESTION # 17
It is good practice for the NACE Inspector to have instrument calibration certificates available:
- A. At all times
- B. In the office only
- C. In the field only
- D. Only if the specification requires it
Answer: A
NEW QUESTION # 18
An Inspector should change position when:
- A. The Inspector is convinced by verifiable facts
- B. The Owner can save some money by the change
- C. Only when directed by the supervisor
- D. The Inspectors position is not the majority position
Answer: A
NEW QUESTION # 19
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT
- A. what items were coated.
- B. how the item was coated.
- C. when the coating will be reapplied.
- D. what materials were used.
Answer: B
NEW QUESTION # 20
Non Conformance Reports are completed by the Inspector:
- A. In every instance that an item does not meet the specification requirements
- B. When the Inspector deems it to be a significant non-conforming item
- C. In accordance with the specification's definition of a non-conformance
- D. When the Inspector and Contractor deem it to be a significant non-conforming item
Answer: D
NEW QUESTION # 21
NACE No. 4/SSPC-SP-7 is a joint standard for
- A. commercial blast cleaning.
- B. brush-off blast cleaning.
- C. near-white metal blast cleaning.
- D. white metal blast cleaning.
Answer: B
NEW QUESTION # 22
Passivation can best be described as:
- A. Treating metal with a liquid inhibiter
- B. A coating layer applied to the surface to inhibit corrosion
- C. A protective metallic oxide surface layer that slows corrosion
- D. Complete elimination pf the corrosion process
Answer: C
NEW QUESTION # 23
You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
Could this have any impact on the final surface preparation appearance?
- A. It depends on which hand tool the Contractor selects
- B. Yes, because the 'two standards are not equivalent
- C. No, because there is no real difference in the standards
- D. It depends on which power tool the Contractor selects
Answer: C
NEW QUESTION # 24
Conventional spray is a good choice when:
- A. High quality finishes are required
- B. High transfer efficiency is required
- C. High production rates are required
- D. High viscosity coatings are being applied
Answer: A
NEW QUESTION # 25
As a NACE Coating Inspector your responsibility with respect to safety is to:
- A. Assume the role of the Safety Inspector
- B. Check the credentials of the Safety Officer on site
- C. Check the PPE used by the Applicators
- D. Act in accordance with the site safety requirements and set an example
Answer: D
NEW QUESTION # 26
Prior to using Inspection Tools the inspector must:
- A. Ensure the instrument is within calibration parameters
- B. Be trained on how to use the instrument
- C. a), b) & c)
- D. Read the manufactures' instructions
Answer: C
NEW QUESTION # 27
What is the minimum spot measurement value allowed by SSPC-PA 2 in each 10 m2 (100 ft2) area?
- A. 100% of the specified maximum thickness
- B. 70% of the specified maximum thickness
- C. 80% of the specified minimum thickness
- D. 90% of the specified maximum thickness
Answer: C
NEW QUESTION # 28
A magnetic pull-off type gauge is a good choice when:
- A. When working on non-ferrous metals
- B. Performing an adhesion test
- C. When an intrinsically safe tool is required
- D. Accuracy is not required
Answer: C
NEW QUESTION # 29
The NACE Inspector should perform tests for soluble salts:
- A. Prior to coating application
- B. Prior to surface preparation
- C. After surface preparation
- D. When specified
Answer: D
NEW QUESTION # 30
Removal of surface contaminants is done by:
- A. Scarifying
- B. A combination of methods
- C. Abrasive blasting
- D. Waterjetting
Answer: B
NEW QUESTION # 31
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use
- A. a detailed checklist and document the lack of a standard.
- B. their best judgment based on similar projects and specifications.
- C. a recognized industry standard like SSPC-PA 2 that is broadly accepted
- D. NACE 2/SSPC SP10
Answer: C
NEW QUESTION # 32
......
Free NACE-CIP1-001 Exam Braindumps NACE Pratice Exam: https://www.itcertmagic.com/NACE/real-NACE-CIP1-001-exam-prep-dumps.html