NEW QUESTION # 17
It is good practice for the NACE Inspector to have instrument calibration certificates available:

  • A. At all times
  • B. In the office only
  • C. In the field only
  • D. Only if the specification requires it

Answer: A


NEW QUESTION # 18
An Inspector should change position when:

  • A. The Inspector is convinced by verifiable facts
  • B. The Owner can save some money by the change
  • C. Only when directed by the supervisor
  • D. The Inspectors position is not the majority position

Answer: A


NEW QUESTION # 19
Good records can provide maintenance departments with detailed information about ALL of the following EXCEPT

  • A. what items were coated.
  • B. how the item was coated.
  • C. when the coating will be reapplied.
  • D. what materials were used.

Answer: B


NEW QUESTION # 20
Non Conformance Reports are completed by the Inspector:

  • A. In every instance that an item does not meet the specification requirements
  • B. When the Inspector deems it to be a significant non-conforming item
  • C. In accordance with the specification's definition of a non-conformance
  • D. When the Inspector and Contractor deem it to be a significant non-conforming item

Answer: D


NEW QUESTION # 21
NACE No. 4/SSPC-SP-7 is a joint standard for

  • A. commercial blast cleaning.
  • B. brush-off blast cleaning.
  • C. near-white metal blast cleaning.
  • D. white metal blast cleaning.

Answer: B


NEW QUESTION # 22
Passivation can best be described as:

  • A. Treating metal with a liquid inhibiter
  • B. A coating layer applied to the surface to inhibit corrosion
  • C. A protective metallic oxide surface layer that slows corrosion
  • D. Complete elimination pf the corrosion process

Answer: C


NEW QUESTION # 23
You are the NACE Inspector on a job where ISO ST 3 has been specified. The Contractor normally works to SSPC standards and been referencing SSPC SP 3.
Could this have any impact on the final surface preparation appearance?

  • A. It depends on which hand tool the Contractor selects
  • B. Yes, because the 'two standards are not equivalent
  • C. No, because there is no real difference in the standards
  • D. It depends on which power tool the Contractor selects

Answer: C


NEW QUESTION # 24
Conventional spray is a good choice when:

  • A. High quality finishes are required
  • B. High transfer efficiency is required
  • C. High production rates are required
  • D. High viscosity coatings are being applied

Answer: A


NEW QUESTION # 25
As a NACE Coating Inspector your responsibility with respect to safety is to:

  • A. Assume the role of the Safety Inspector
  • B. Check the credentials of the Safety Officer on site
  • C. Check the PPE used by the Applicators
  • D. Act in accordance with the site safety requirements and set an example

Answer: D


NEW QUESTION # 26
Prior to using Inspection Tools the inspector must:

  • A. Ensure the instrument is within calibration parameters
  • B. Be trained on how to use the instrument
  • C. a), b) & c)
  • D. Read the manufactures' instructions

Answer: C


NEW QUESTION # 27
What is the minimum spot measurement value allowed by SSPC-PA 2 in each 10 m2 (100 ft2) area?

  • A. 100% of the specified maximum thickness
  • B. 70% of the specified maximum thickness
  • C. 80% of the specified minimum thickness
  • D. 90% of the specified maximum thickness

Answer: C


NEW QUESTION # 28
A magnetic pull-off type gauge is a good choice when:

  • A. When working on non-ferrous metals
  • B. Performing an adhesion test
  • C. When an intrinsically safe tool is required
  • D. Accuracy is not required

Answer: C


NEW QUESTION # 29
The NACE Inspector should perform tests for soluble salts:

  • A. Prior to coating application
  • B. Prior to surface preparation
  • C. After surface preparation
  • D. When specified

Answer: D


NEW QUESTION # 30
Removal of surface contaminants is done by:

  • A. Scarifying
  • B. A combination of methods
  • C. Abrasive blasting
  • D. Waterjetting

Answer: B


NEW QUESTION # 31
If the project specification DOES NOT state the specific DFT measurement standards, the inspector should use

  • A. a detailed checklist and document the lack of a standard.
  • B. their best judgment based on similar projects and specifications.
  • C. a recognized industry standard like SSPC-PA 2 that is broadly accepted
  • D. NACE 2/SSPC SP10

Answer: C


NEW QUESTION # 32
......