NEW QUESTION # 47
You need to model goods receipt processing time in detailed scheduling. Whic modeling options do you have?

  • A. Model a handling resource in the location master and goods receipt time in the material master.
  • B. Model a seperate resource in the production data structure.
  • C. Model a resource inbound in the location master.
  • D. Model a transportation resorce in the location master.

Answer: A,D


NEW QUESTION # 48
Your quality department detect a deviation in a raw material batch. Unfortunately, this batch has already been used in producion. How can you indentify all affected finish goods stocks?

  • A. Use the batch information cockpit.
  • B. Use the material staging report.
  • C. Use the material where-used report.
  • D. Use batch determination.

Answer: A


NEW QUESTION # 49
Which of the following is valid sequence of the main activities in production order processing?

  • A. Creation, release, settlement, goods issue, confirmation, goods receipt
  • B. Creation, availability check, release, material widrawal, confirmation
  • C. Creation, release, printing, goods issue, confirmation, goods receipt
  • D. Creation, printing, release, goods issue, confirmation, goods receipt

Answer: B,C


NEW QUESTION # 50
Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. Variable-size item
  • B. Work item
  • C. WBS item
  • D. Non-stock item

Answer: A,D


NEW QUESTION # 51
What are the consequences if the Dispatched operation status is set for a production order operation?

  • A. You can reschedule the operation using midpoint scheduling in a planning table.
  • B. You can reschedule the operation using finite scheduling in planning table
  • C. You can reschedule the operation using lead time scheduling in a planning table
  • D. You can reschedule the order using infinite scheduling in a planing table

Answer: B,C


NEW QUESTION # 52
You are working with planning strategy 40 (Planning-with-final assembly) When does consuption of planned independent requirements take places?

  • A. When you create a planned order
  • B. When you deliver a sales order
  • C. When the MRP result are saved
  • D. When you create a sales order

Answer: D


NEW QUESTION # 53
Which SAP application can be used for forcasting in Supply Chain Planning?

  • A. Capacity Requirements Planning (CRP)
  • B. Supply Chain Management(SCM)
  • C. Material Requirements Planning (MRP)
  • D. Integrated Business Planning (IBP)

Answer: B,D


NEW QUESTION # 54
For a production version to be valid and consistent what requirements must be fulfilled?

  • A. The deletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • C. The lot size range must be within the lot-size range of the assigned routing.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C


NEW QUESTION # 55
Which of the following processes lead to an entry in the MRP planing file?

  • A. Creation of dependent requirements
  • B. Change of the storage bin
  • C. Change of the material's procurement type
  • D. Creation of sales order
  • E. Creation of purchasing contract

Answer: A,C,D


NEW QUESTION # 56
Which materials have a negative quantity in a bill of materials or in a recipe?

  • A. By-products
  • B. Waste products
  • C. Co-products
  • D. Bulk materials
  • E. Continuous flow materials

Answer: A,C,E


NEW QUESTION # 57
Why would you use phantom assemblies?

  • A. To make the assignment of components easier
  • B. To reduce the number of material masters
  • C. To simplify the structure of bills of materials
  • D. To reduce the number of changes required in bills of materials
  • E. To increase the number of planning levels

Answer: A,C,D


NEW QUESTION # 58
How can you set up the supply source for the Kanban process in SAP S/4HANA?

  • A. Using run schedule quantities for in-house production
  • B. Using stock transfer reservations for stock transfer
  • C. Using quotations for internal and external procurement
  • D. Using purchasing costs for automated source prioritization
  • E. Using purchase orders for external procurement

Answer: A,B,E


NEW QUESTION # 59
Which of the following questions do you have to answer before you start creating a BOM?

  • A. Is the material type allowed in the BOM?
  • B. Which Valid To information is necessary?
  • C. In which storage location is the BOM required?
  • D. What status does the BOM have?

Answer: A,B


NEW QUESTION # 60
What is the difference between co-products and by-products?

  • A. Only co-products can be manufactured in isolation from the main product.
  • B. Only by-products have a zero inventory valuation.
  • C. Only co-products appear in the process or production order settlement rule.
  • D. Only co-products are identified by a special item category in the bill of material (BOM).

Answer: C


NEW QUESTION # 61
In your plant, MRP is activated.
Which option do you have to exclude a materila from the MRP run?

  • A. Use a specific MRP type
  • B. Use a specific material group
  • C. Use specific MRP controller
  • D. Use a specific material status

Answer: B,C


NEW QUESTION # 62
What is the purpose of a reporting point confirmation in repetitive manufacturing?

  • A. To reduce the total production lead time for along production line
  • B. To provide timely updates of inventory management for the staged components
  • C. To determine the work in progress along the production line
  • D. To stage different components for a production line simultaneously

Answer: B,C


NEW QUESTION # 63
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

  • A. By usage probability
  • B. Simultaneous
  • C. 100% check
  • D. First in first out (FIFO)

Answer: A,C


NEW QUESTION # 64
How can SAP S/4HANA support a GMP-compliant production process?

  • A. Approved resources
  • B. GMP-compliant flag
  • C. Digital signature
  • D. Batch record
  • E. Recipe approval

Answer: C,D,E


NEW QUESTION # 65
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Make-to-order production (20)
  • B. Planning with final assembly (40)
  • C. Planning at assembly level (70)
  • D. Planning without final assembly (50)

Answer: D


NEW QUESTION # 66
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

  • A. Run MRP with automatic selection of production version.
  • B. Run MRP with quota arrangement.
  • C. Run PP/DS heuristics for repetitive manufacturing.
  • D. Assign planned orders manual lying the planning table.

Answer: B,C


NEW QUESTION # 67
......