NEW QUESTION 65
When installing the power line on the UPS5000-E, if there are different sources on the main-lines and bypass, you need to remove the copper bars connected to the bypass and main lines first, and then connect the main circuit and bypass input respectively.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 66
Common monitoring software structures include B/S and C/S architectures.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 67
In the NetCol5000-A air conditioner, if a large number of air bubbles are observed in the liquid crystal mirror, it indicates that the refrigerant system lacks refrigerant, and the refrigerant should be charged as needed.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 68
Domains can be created in NetEco, such as campuses, buildings, machine rooms, containers, etc.

  • A. TRUE
  • B. FALSE

Answer: A

 

NEW QUESTION 69
In ECO mode, the UPS operates in the () state when the input is stable.

  • A. Main road inverter
  • B. Maintenance bypass
  • C. Battery
  • D. Bypass

Answer: D

 

NEW QUESTION 70
If the customer load cannot be power-off, what should be taken care when closing the maintenance bypass switch? (Multiple choice)

  • A. First perform EPO then close maintenance switch
  • B. The maintenance bypass switch can also be closed in the inverter power supply mode.
  • C. Turn off the inverter, let the UPS be in bypass power supply mode and then close the maintenance bypass switch.
  • D. Close the maintenance switch first and then execute the EPO.

Answer: C,D

 

NEW QUESTION 71
When the Huawei air-cooled air conditioner outdoor unit is installed horizontally, the distance between the two outdoor units is greater than or equal to () mm.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 72
The technical essentials for the pumping action of the pipeline are: the degree of vacuum is not greater than ( ) Pa (absolute pressure).

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

 

NEW QUESTION 73
If the UPS5000-E-400K is bypassed and the maintenance bypass is closed, both the main power module and the bypass module stop working.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 74
When inspecting, maintaining and repairing electrical equipment in non-blackout mode, a warning sign or signage should be placed on the electrical installation and work area.

  • A. True
  • B. False

Answer: A

 

NEW QUESTION 75
NeCol5000-C nitrogen filling pressure value is (); holding time is ().

  • A. 0.8MPa; 24h
  • B. 0.8MPa; 12h
  • C. 1.0MPa; 12h
  • D. 1.0MPa; 24h

Answer: A

 

NEW QUESTION 76
There is no limit to the total length of the direct expansion air-cooled air-conditioning refrigerant pipe.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 77
The NetCol5000-A35kW air conditioner has a light load dehumidification function.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 78
ECC800 does not support historical data export.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 79
Which interface is not on the smart ETH socket?

  • A. PoE
  • B. AI/DI
  • C. PWR_OUT power cascade interface
  • D. PWR_IN power cascade interface

Answer: B

 

NEW QUESTION 80
When the single machine is working, after the function of power-off of the ups2000-g machine is prohibited, the PL port has no output when overload or battery power is low.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 81
The FusionModule1000B series solution can meet the Tier4 power supply requirements when using the 2N power supply and distribution system.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 82
The RH2288 server supports () power input.

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 83
The cabinet collector cannot be used for environmental data collection of IT cabinets.

  • A. False
  • B. True

Answer: A

 

NEW QUESTION 84
Among the components of the UPS5000-E, () can be hot plug. (Multiple choice)

  • A. Energy Control Sheet
  • B. Bypass module
  • C. Dry joint card
  • D. Power module

Answer: A,B,C,D

 