IIBA CCBA certification is a valuable credential for business analysts who want to enhance their skills and knowledge and demonstrate their commitment to the profession. It provides a recognized standard for employers to evaluate the capabilities of their business analysts and ensures that the certification holder has met the necessary requirements to be an effective business analyst.

 

NEW QUESTION # 160
A project is initiated to create new financial reports for the accounting department, and the accountants have a wide range of views as to what would serve them best. What should the business analyst (BA) do to develop the correct set of requirements?

  • A. Perform a feasibility study
  • B. Estimate the scope of work
  • C. Resolve differences of opinion
  • D. Conduct an impact analysis

Answer: C

Explanation:
The BA should resolve differences of opinion among the accountants to develop the correct set of requirements. This is because resolving differences of opinion is a technique that involves identifying and addressing conflicts or disagreements among stakeholders regarding their needs, expectations, or preferences.
Resolving differences of opinion can help to achieve a consensus on the requirements and ensure that they reflect the best interests of the stakeholders. The other options are not as relevant or necessary as resolving differences of opinion. References:
BABOK Guide, section 10.20: Resolve Differences of Opinion
CCBA Practice Test, question 118


NEW QUESTION # 161
All of the following statements are true regarding a brainstorming session during requirements elicitation except for which one?

  • A. All ideas should be shared without any discussion, criticism, or evaluation.
  • B. All ideas should be visibly recorded.
  • C. The ideas should be generated with a cost or time estimate.
  • D. The number of ideas should not be limited.

Answer: C

Explanation:
During a brainstorming session, there is not a time or cost estimate consideration; the participants should generate as many ideas as possible.
Answer A is incorrect. This is a true statement; all ideas should be visibly recorded.
Answer D is incorrect. This is a true statement; all ideas should be shared without any discussion, criticism, or evaluation.
Answer B is incorrect. This is a true statement; the number of ideas should not be limited.


NEW QUESTION # 162
The business need is considered to be the most critical step in the business analysis effort. Why is the definition of the business need considered the most critical step?

  • A. The definition of the business need determines future solutions, stakeholders, and approaches.
  • B. The business need takes the longest time and costs most of the business analysis efforts.
  • C. The business need defines the problem the business analyst is finding a solution for.
  • D. The business need defines the solution for the business problem.

Answer: A

Explanation:
Explanation
The way the business need is defined directly affects the solutions offered, the stakeholders involved, and the approaches the organization may take to seize the opportunity or solutions.
Answer A is incorrect. This is the definition of what the business need is, but it's not the best answer for the QUESTION.
Answer B is incorrect. The business need does not define the solution; it shows the need for a solution.
Answer C is incorrect. This is not a valid statement about this process of the business analysis effort.


NEW QUESTION # 163
When a business analyst performs requirements tracing, he may need to trace the requirements backward through their lineage and may need to trace the requirements forward through their relationship to other requirements. What is the backwards tracing activity called in requirements traceability?

  • A. Allocation
  • B. Backwards pass
  • C. Lineage tracking
  • D. Derivation

Answer: D

Explanation:
Explanation/Reference:
Backward tracing of a requirement is called its derivation, as the requirements may be derived from other older requirements.
B is incorrect. Lineage tracking is not a valid term, so this choice is not valid.
A is incorrect. Allocation is the forward tracking of a requirement to future requirements in the set
of requirements.
D is incorrect. Backwards pass isn't a valid requirements tracing term; it describes a process in
schedule management.


NEW QUESTION # 164
When a business analyst wants to present requirements for review, she must consider the requirements, audience, and what other factor to determine the level of formality in the presentation?

  • A. Regulations
  • B. Governance
  • C. Organizational process assets
  • D. Standards

Answer: C


NEW QUESTION # 165
You are the business analyst for your organization and you're creating the requirements package. In this documentation, to what level should you document the requirements for your stakeholders?

  • A. All requirements should be defined to the extent the organizational process assets demand.
  • B. All requirements should be defined in detail to the work package level of WBS.
  • C. All requirements should be defined only to the extent needed to assure understanding by the team.
  • D. All requirements should be clearly defined with technical, business, functional, and non-functional attributes.

Answer: C

Explanation:
When creating the requirements package, as in this scenario, it's mandatory that the requirements be defined with enough detail that the team can understand the requirements.
Answer D is incorrect. This isn't a valid explanation for the level of detail needed in the requirements package.
Answer A is incorrect. Not all requirements need the technical, business, functional, and non-functional requirements.
Answer C is incorrect. The organizational process assets won't demand that the requirements be defined to any extent. This isn't a valid answer for this QUESTION.


NEW QUESTION # 166
Which of the following is used as a means of validating a created, selected, or tailored business analysis approach?

  • A. Decision analysis
  • B. Progressive elaboration
  • C. Process modeling
  • D. Structured walkthrough

Answer: D

Explanation:
Structured walkthrough is used as a means of validating a created, selected, or tailored business analysis approach.
Answer C is incorrect. Decision analysis is used to rate available methodologies against organizational needs and objectives.
Answer A is incorrect. Process modeling is used to define and document the business analysis approach.
Answer B is incorrect. Progressive elaboration describes the process of providing more and more information through incremental details. It is a form of deductive reasoning to go from a very broad set of requirements to the exact details on the requirements.


NEW QUESTION # 167
Enterprise analysis provides many things for an organization. All of the following are tasks included in enterprise analysis except for which one?

  • A. Determine solution approach
  • B. Assess capability gaps
  • C. Define business need
  • D. Solution performance assessment

Answer: D

Explanation:
Explanation/Reference:
Solution performance assessment is not a task of enterprise analysis; it is in an input to this process. There are five tasks for enterprise analysis. define business need, assess capability gaps, determine solution approach, define solution scope, and define business case.
Enterprise analysis is a business analysis activity that helps define and identify business opportunities for an organization.
C, A, and B are incorrect. This is an enterprise analysis task.


NEW QUESTION # 168
Mark is the business analyst for his organization. He is working with the solution development team and he believes that the team does not want to implement a certain portion of the requirements. The team is expressing the difficulty of the requirements and how it will be extremely challenging to complete. When Mark asks about a similar project that the team completed, they insist that this is a different type of requirements though Mark believes that it is not. What is the solution development team appearing to do to the requirements?

  • A. Change the prioritization of the requirements based on the past project.
  • B. Have the business analyst report the difficulty of the project work to the project customer.
  • C. Change the prioritization of the requirements based on overstated complexity of the project work.
  • D. Get the requirements removed from the project scope.

Answer: C

Explanation:
In this instance it appears that the solution development team is attempting to change the prioritization of the requirements to their benefit by overestimating the complexity of the project work.


NEW QUESTION # 169
You work as a business analyst for u Certify Inc. You have been assigned the task to implement the job shadowing process. Which of the following statements are true regarding the job shadowing process? Each correct answer represents a complete solution.

  • A. The job shadowing process is a part of business analysis planning and monitoring activities.
  • B. In this process, the observer has to understand their work process for better assessment of the modifications of the work required.
  • C. Job shadowing is an elicitation process that is a part of job observation.
  • D. In this process, the observer is required to keep an eye on those workers whose work routine is down and who are unable to explain their work.

Answer: B,C

Explanation:
Explanation
The job shadowing process is a type of observation technique that involves following and watching a person performing a specific work activity. It is used to elicit information about the tasks, tools, events, and interactions involved in the work process, as well as the challenges, opportunities, and needs of the workers.
The observer can either ask questions during the observation (active approach) or after the observation (passive approach) to clarify and validate the information gathered. The job shadowing process helps the business analyst to understand the current state of the work process and to identify the potential improvements or changes required for the future state12.
The other options are not correct because:
Option A is incorrect. The job shadowing process is not a part of business analysis planning and monitoring activities. It is a part of business analysis elicitation and collaboration activities. Business analysis planning and monitoring activities involve defining the approach, scope, tasks, deliverables, schedule, and resources for the business analysis process3.
Option B is incorrect. The job shadowing process does not require the observer to keep an eye on those workers whose work routine is down and who are unable to explain their work. This is a biased and negative assumption that does not reflect the purpose and value of the job shadowing process. The job shadowing process is meant to observe any worker who performs the work activity of interest, regardless of their performance level or communication skills. The observer should respect the worker's privacy, autonomy, and dignity, and should not judge or evaluate their work4.
References:
Observation techniques for business analysts - The Functional BA, section "Observation of activities or job shadowing, is the act of studying a work activity as it is being performed." How to Make a Job Shadowing Program a Success - AIHR, section "What is job shadowing?" Business Analysis Expert Certification, CCBA® | IIBA®, section "BABOK® Guide v3", chapter 2, section 2.1 Job Shadowing: A Guide for Employees and Managers, section "Job Shadowing Etiquette"


NEW QUESTION # 170
Which stakeholder in the solution assessment task will provide information on technical constraints that could limit the solutions that may be implemented?

  • A. Sponsor
  • B. Operational support
  • C. Suppliers
  • D. Project manager

Answer: B

Explanation:
Operational support can provide information on technical constraints that may limit the solutions that can be implemented.
Answer B is incorrect. Suppliers provide information on the functionality associated with a particular solution option.
Answer C is incorrect. The sponsor approves the expenditure of resources to purchase or develop a solution and approve the final recommendation.
Answer A is incorrect. The project manager plans and manages the selection process of the solution.


NEW QUESTION # 171
Which of the following is a business management strategy originally developed by Motorola, USA in 1986?

  • A. Six Sigma
  • B. Lean
  • C. Quality Circle
  • D. Waterfall model

Answer: A

Explanation:
Six Sigma is a business management strategy originally developed by Motorola, USA in 1986. It is widely used in many sectors of industry, although its use is not without controversy. The Six Sigma approach seeks to improve the quality of process outputs by identifying and removing the causes of defects (errors) and minimizing variability in manufacturing and business processes. It uses a set of quality management methods, including statistical methods, and creates a special infrastructure of people within the organization who are experts in these methods. Each Six Sigma project carried out within an organization follows a defined sequence of steps and has quantified financial targets.


NEW QUESTION # 172
You're organizing the business analysis approach for your organization. Jane wants to know when changes to requirements are most likely to happen in business analysis processes. Which one of the following statements best describes when changes to requirements may happen?

  • A. Changes to requirements may happen at any time.
  • B. Changes to requirements usually happen early in the business analysis processes.
  • C. Changes to requirements usually happen at the end of the business analysis processes.
  • D. Changes to requirements happen after the business analysis processes.

Answer: A

Explanation:
Explanation
Changes to requirements may happen at any time in the business analysis processes and throughout the project. When these changes happen later in the process, it becomes more difficult to accept, communicate, and manage those changes.
Answer B is incorrect. Changes may happen at any time, not just at the beginning of the processes.
Answer A is incorrect. Changes don't just happen at the end of the business analysis processes.
Answer D is incorrect. Changes may happen at any time, not just after the business analysis processes.


NEW QUESTION # 173
A business analyst is helping management determine which solution they should choose. As it happens that the organization can only choose one of the two solutions due to time and resource restrictions. Solution A worth $456,000 to the organization while solution B worth $565,000 to the organization. While solution A costs less, it is less risky and takes less time to complete so management elects to seize Solution A.
What is the opportunity cost?

  • A. There is not enough information to know how much the solution will cost the organization.
  • B. $456,000
  • C. $565,000
  • D. $109,000

Answer: C

Explanation:
Explanation
The opportunity cost is the total value of the opportunity that can be taken advantage of.


NEW QUESTION # 174
You are the business analyst for your organization. You're considering if you should make a solution or purchase it from a vendor. If your team creates the solution, it will cost $286,000 and will cost $2,400 per month to support. The vendor's solution, however, will cost $239,000 and will cost $2,850 per month to support. How long will you need to use your in-house solution to be more cost effective than the vendor's proposed solution?

  • A. 64 months
  • B. 105 months
  • C. 19 months
  • D. 32 months

Answer: A

Explanation:
Explanation
To answer this question, you need to compare the total cost of ownership (TCO) of the two solutions over time. The TCO is the sum of the initial cost and the recurring cost multiplied by the number of months. You can set up an equation to find the break-even point where the TCO of the two solutions are equal:
286,000 + 2,400x = 239,000 + 2,850x
Solving for x, you get x = 64. This means that after 64 months, the TCO of the two solutions will be the same.
Therefore, you need to use your in-house solution for more than 64 months to be more cost effective than the vendor's solution.
References:
Business Analysis Expert Certification, CCBA® | IIBA®, section "Business Analysis Planning and Monitoring", subsection "Plan Business Analysis Approach".
A Guide to the Business Analysis Body of Knowledge® (BABOK® Guide), version 3, chapter 3, section 3.1.4.


NEW QUESTION # 175
Before requirements can actually be approved to be managed, what must be true about the requirements?

  • A. Requirements are governed by the requirements management plan.
  • B. Requirements must support the solution scope.
  • C. Requirements must be approved by the technical review board.
  • D. Requirements must support the requirements management plan.

Answer: B

Explanation:
Explanation
Before requirements can be approved to be managed, they must be verified and validated to ensure that they are aligned with the solution scope, which is the set of capabilities and conditions that the solution must satisfy to meet the business need12. Requirements that do not support the solution scope may introduce unnecessary complexity, cost, or risk to the project, or may not deliver the expected value to the stakeholders. Therefore, it is important to check that the requirements are consistent, complete, correct, feasible, and testable before approving them to be managed3. References:
1: BABOK® Guide, Version 3.0, p. 33
2: Business Analysis Expert Certification, CCBA® | IIBA®
3: BABOK® Guide, Version 3.0, p. 41


NEW QUESTION # 176
In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

  • A. Business analysis performance assessment
  • B. Stakeholder tolerance for risk
  • C. Stakeholder list, roles, and responsibilities
  • D. Business analysis approach

Answer: B

Explanation:
Stakeholder tolerance for risk is not a valid input for planning business analysis activities.
Answer A, D, and C are incorrect. Following are the inputs in Plan Business Analysis Activities: Business Analysis Approach Business Analysis Performance Assessment Organizational Process Assets Stakeholder List, Roles, and Responsibilities


NEW QUESTION # 177
Which approach is best to take when a business analyst is assessing the solution options for a business need when there are relatively few criteria involved?

  • A. Focus on the life cycle costs of the solutions.
  • B. Focus on the commonalities of the solutions.
  • C. Focus on the implementation cost of the solutions.
  • D. Focus on the differences of the solutions.

Answer: D


NEW QUESTION # 178
Jason is creating a business case for his organization and management has asked him to assess the appropriate risks in the business case regarding the solution. Which one of the following risks is not a concern for Jason when defining the business case and associated risks?

  • A. Financial risk
  • B. Organizational risk
  • C. Positive risk
  • D. Technical risk

Answer: C

Explanation:
Explanation
Positive risks are risks that may bring about a positive outcome if the event happens. This is not a concern for Jason in the initial risk assessment in the business case.
Answer D is incorrect. Technical risks evaluate whether the chosen technology and suppliers can deliver the
required functionality.
Answer A is incorrect. Financial risks evaluate whether costs may exceed levels that make the solution viable
or potential benefits may disappear.
Answer C is incorrect. Organizational risks determine whether the organization will make the changes
necessary to benefit from the new solution.


NEW QUESTION # 179
During a lessons learned session, stakeholders had a heated discussion on the performance measures being employed and why they are necessary. The business analyst (BA) explained that performance measures are required to:

  • A. verify that organizational resources were spent wisely.
  • B. evaluate whether the required return on investment is met.
  • C. gather insights into the value provided by a solution.
  • D. decide if similar projects should be taken up again.

Answer: C

Explanation:
Process performance measures are parameters that are used to identify process improvement opportunities. Process performance measures are defined and deployed to ensure that processes are aligned to the business needs and strategic objectives of the organization. Process performance measures can address many aspects of a process including quality, time, cost, agility, efficiency, effectiveness, responsiveness, adaptability, flexibility, customer satisfaction, velocity, variability, visibility, variety, rework, and volume. Many of the process performance measures seek to measure the effectiveness and efficiency of the process as well as the degree to which the process goals are achieved.


NEW QUESTION # 180
One of the tasks that the business analyst (BA) needs to complete is to maintain the requirements. As much as the BA values and sees the benefits of maintaining the requirements, the project manager (PM) does not see the same. In order to help the PM understand the value of this task, which following benefit of maintaining the requirements should the BA communicate to the PM?

  • A. They identify the financial projections of the project.
  • B. They define the project schedule and future tasks.
  • C. They can easily be traced and reused for future.
  • D. They describe how to setup the traceability tools.

Answer: C

Explanation:
Explanation
According to the BABOK Guide, maintaining requirements is the process of ensuring that the requirements and designs remain aligned to and fulfill the business need1. One of the benefits of maintaining requirements is that they can easily be traced and reused for future projects or initiatives2. This can save time, effort, and resources for the organization. Therefore, the BA should communicate this benefit to the PM to help him or her understand the value of this task. References: BABOK Guide, CCBA Exam Prep


NEW QUESTION # 181
Which approach is used to focus on minimizing up-front uncertainty?

  • A. Plan-driven approach
  • B. Class-driven approach
  • C. Change driven approach
  • D. Solution-driven approach

Answer: A


NEW QUESTION # 182
Which solution scope creation technique can be best described as the depiction of the scope of work required to integrate the new solution into the business and technical environments?

  • A. Scope modeling
  • B. Functional decomposition
  • C. Interface analysis
  • D. User stories

Answer: C

Explanation:
Explanation/Reference:
The interface analysis technique depicts the scope of work required to integrate the solution into the business environment.
D is incorrect. Functional decomposition is used to understand the scope of work and to break the
solution scope into smaller work products or deliverables.
A is incorrect. Scope modeling is used to identify appropriate boundaries for the solution scope.
C is incorrect. User stories describe stakeholders and the goals the system supports and as such
can also be used to define the solution scope.


NEW QUESTION # 183
Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?

  • A. Requirements foundation
  • B. Product scope
  • C. Requirements envisioning
  • D. Project scope

Answer: B

Explanation:
Explanation
Product scope is the features and functions that characterize a product, service, or result1. It defines what the product or service will do and how it will meet the customer needs and expectations2. Product scope is different from project scope, which is all the work needed to deliver a product, service, or result as defined in product scope1. Requirements envisioning is a technique to collaboratively identify and define the high-level features and scope of a solution3. Requirements foundation is a term used by IIBA to describe the core concepts of business analysis, such as requirements, stakeholders, and business analysis planning and monitoring4. References:
Certification of Capability in Business Analysis (CCBA®) Handbook, page 5, section "4. Review the Exam Blueprint" Business Analysis Expert Certification, CCBA® | IIBA®, section "BABOK® Guide v3" Requirements Envisioning: An Agile Best Practice Business Analysis Core Concept Model™ (BACCM™)


NEW QUESTION # 184
A business analyst (BA) has documented the components of an information technology (IT) library, in preparation for establishing a consolidated catalogue of IT services. When interviewed, several of the IT managers indicated they already have a catalogue, and have no additional information to provide. What activity is necessary to support the project?

  • A. Expand the interview list
  • B. Confirm the project objectives
  • C. Analyze existing catalogues
  • D. Conduct a focus group

Answer: C

Explanation:
Explanation
According to the BABOK® Guide, one of the tasks of the business analyst (BA) is to analyze current state, which involves understanding the existing situation and identifying the capabilities and elements that may be reused or require improvement. In this case, the BA has documented the components of an IT library, but has not analyzed the existing catalogues of IT services that some IT managers have. By analyzing the existing catalogues, the BA can identify the gaps, overlaps, inconsistencies, and opportunities for improvement in the current state. This will help the BA to support the project of establishing a consolidated catalogue of IT services. References: BABOK® Guide, Version 3, Chapter 5: Strategy Analysis, Section 5.1: Analyze Current State, Page 108; Chapter 10: Techniques, Section 10.3: Business Capability Analysis, Page 378.


NEW QUESTION # 185
......