The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and inādepth technical skills to participate as a member of a project team in a mentored role.
NEW QUESTION 88
Your project team decides to use a make-to-order planning strategy for a strategic material in discretemanufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Production orders are created with sales order reference.
- B. Sales order-specific stock is created
- C. Storage location MRP areas are required.
- D. Net requirements calculation is sales order-specific.
- E. Sales order-specific planning run is required.
Answer: A,B,D
NEW QUESTION 89
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?
- A. Backflushing
- B. Kanban
- C. Picking list
- D. Transfer Order
Answer: C
NEW QUESTION 90
If you use floats to limit dispatching in capacity planning, what type of time element can be reduced by strategy settings while dispatching?
- A. Minimum wait time
- B. Goods receipt processing time
- C. Queue time
- D. Production time
Answer: C
NEW QUESTION 91
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.
- A. Production cost collector
- B. Production version
- C. Repetitive manufacturing profile
- D. Routing
Answer: B,D
NEW QUESTION 92
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
- A. Infinite resource and infinite strategy
- B. Infinite resource and finite strategy
- C. Finite resource and finite strategy
- D. Finite resource and infinite strategy
Answer: C
NEW QUESTION 93
In which of the following master data objects can you define the production order default storage location for a material component? There are 2 correct answers to this question.
- A. Work center, in the production supply area
- B. Material master of the finished product
- C. BOM, in the item for the material
- D. Material master of the finished product
Answer: A,C
NEW QUESTION 94
How would you define pegging in the context of Advanced Planning?
- A. An evaluation that is ordered according to the network structure of all related products and represents the coverage of issue elements with receipt elements.
- B. An evaluation to verify if there are mater al or capacity shortages in the network after the production planning run.
- C. An evaluation that is ordered according to the bill-of-material structure of all related products and represents the relationship between the receipt and the issue elements.
- D. An evaluation to verify if there are overstock situations in the balance between receipt and issue elements after the production planning run.
Answer: C
NEW QUESTION 95
What are some of the advantages of using Kanban? There are 2 correct answers to this question.
- A. Replenishments are created close to the actual need
- B. It is mostly accomplished by manual postings
- C. Replenishments are based on centralized planning
- D. It is a simplified form of production control
Answer: A,D
NEW QUESTION 96
You want to create a production order from a planned order. What methods could you use? Note: There are 2 correct answers to this question.
- A. Full conversion
- B. Individualconversion
- C. Order release
- D. Partial conversion
Answer: A,D
NEW QUESTION 97
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the extra demand. Which is the appropriate planning strategy to use?
- A. 10 - Anonymous make-to-stock
- B. 50 - Planning without final assembly
- C. 40 - Planning with-final-assembly
- D. 20 - Make to order production
Answer: C
NEW QUESTION 98
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
- A. Bill of material
- B. Material master
- C. Work center
- D. Routing header
Answer: A,B
NEW QUESTION 99
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.
- A. Past quotation quantities
- B. Past procurement quantities
- C. Past sales order quantities
- D. Market intelligence
- E. One-off events
Answer: C,D,E
NEW QUESTION 100
What is the equivalent in SAP S/4HANA of the Production Data Structure in PP/DS?
There are 3 correct answers to this question.
- A. Engineering Change Record
- B. Production Version
- C. Routing
- D. Bill of Material
Answer: B,C,D
NEW QUESTION 101
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan? There are 2 correct answers to this question.
- A. In the material master record, set MRP type to PI and a planning time fence on the replenishment lead time of the material
- B. Manually firm all planned orders for materials within the replenishment lead time of the material
- C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- D. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
Answer: B,C
NEW QUESTION 102
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA.
When can you use mode selection?
- A. When multiple production versions are maintained for one product
- B. When alternate resources are used within one operation
- C. When multiple planned orders exists in one resource
- D. When multiple operations are maintained for one product
Answer: B
NEW QUESTION 103
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the bill of materials (BOM)
- B. In the production order type
- C. In the routing
- D. In the MRP controller
- E. In the production version