Microsoft MB-335: Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert Exam is a certification that validates the skills and knowledge of candidates in implementing and managing supply chain management processes using Dynamics 365. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification is ideal for professionals who aim to become supply chain management consultants who can optimize and streamline business processes using Dynamics 365.

 

NEW QUESTION # 42
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.
A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.
For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.
You need to create and configure the product and pricing for the new speaker.
Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.
Docs the solution meet the goal?

  • A. Yes
  • B. No

Answer: A

Explanation:
Explanation
The solution meets the goal. Here is the explanation:
To create and configure the product and pricing for the new speaker, you should use the following steps1:
Create a product master for the speaker and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the speaker and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the speaker. For example, you can add an attribute for carbon fiber options and specify Standard and Premium as the values. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the speaker and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for carbon fiber options and specify different prices for Standard and Premium values. You can also add price components for other attributes that affect the price of the speaker.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the speaker. You can also view the price details and see how each price component contributes to the total price.
1: Product configuration overview : Create constraint-based configuration : Price models


NEW QUESTION # 43
A beverage company uses Dynamics 365 Supply Chain Management batch processing for production- You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.
What is the ingredient type?

  • A. active
  • B. compensating
  • C. none
  • D. filler

Answer: A

Explanation:
The ingredient type used in batch processing when the base attribute of a product is added to a formula line is Active. Here is the explanation:
A formula line is a line that identifies an ingredient or item that makes up a formula. A formula line can have one of these ingredient types: None, Active, Compensating, or Filler1. The ingredient type determines how the system handles the line during master planning and batch order production1.
The Active ingredient type indicates that the item is an active ingredient that has a variable quantity and a fixed potency. The active ingredient of a product is modeled by using a product-specific batch attribute that has a minimum value, a maximum value, and a target level2. The target level of a batch attribute represents the estimated percentage of an active ingredient in a product2.
When the base attribute of a product is added to a formula line, it means that the product has an active ingredient that is defined by the base attribute. Therefore, the ingredient type for the formula line should be Active. This way, the system can calculate the amount of ingredients to use in a production batch based on the concentration of active ingredients in selected product batches2. This process is known as batch balancing2.
1: Batch balancing 2: Formulas and formula versions


NEW QUESTION # 44
You work for a gem wholesaler that sells raw diamonds. Diamonds are purchased and sold in individual boxes but weighed and inventoried in carats.
You are setting up a catch weight item for diamonds. Each box of diamonds must be tracked by its individual container weight.
You need to set up this item as a full visibility catch weight item.
Which two steps must you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Assign a Tracking dimension group with batch number as the only active tracking dimension.
  • B. Assign it a Serial number group with per qty. defined as 1.
  • C. Create an inter-class unit of measure conversion between boxes and carats.
  • D. Assign the item a Tracking dimension group with active serial number control

Answer: C,D

Explanation:
A catch weight item is an item that is sold by one unit of measure but is managed in inventory by a different unit of measure1. For example, diamonds are sold by boxes but weighed by carats. A full visibility catch weight item is a catch weight item that requires the weight of each individual container to be tracked2. For example, each box of diamonds must have its own weight recorded.
To set up a catch weight item for diamonds, you must do the following steps2:
Assign the item a Tracking dimension group with active serial number control. This enables the item to be tracked by serial numbers, which represent the individual containers of the item.
Each serial number will have its own weight associated with it.
Assign the item a Serial number group with per qty. defined as 1. This ensures that each container of the item has a unique serial number and that only one container can be assigned to a serial number.
Create an inter-class unit of measure conversion between boxes and carats. This defines the relationship between the sales unit and the inventory unit of the item. The conversion factor can be based on a nominal weight or an average weight of the containers.


NEW QUESTION # 45
You need to configure the bicycles' production resource.
Which option should you use?

  • A. Exclusive capacity set to yes and infinite capacity.
  • B. Exclusive capacity set to yes and enter a Batch capacity.
  • C. Exclusive capacity set to no and enter a Batch capacity.
  • D. Exclusive capacity set to no and infinite capacity.

Answer: A

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/operations-resources


NEW QUESTION # 46
A manufacturing company uses Dynamics 365 Supply Cham Management.
The company identifies a bill of materials (BOM) item that needs to be recalled for a product The engineering department needs to link customer support incidents and knowledgebase articles related to the product change.
Other items affected by this change must reference the same support incidents and knowledgebase articles.
You need to recommend features to facilitate this business process.
Which features should you recommend? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 47
You are a production manager at a company which produces large batches of coffee and creamers.
After a quality inspection, batch 120008 of your cold brew coffee (item number CB-0001) was found to be too acidic and must be reworked.
You need to add 20 grams of sugar and stir the product for an additional 0.S hours.
What three actions are required on the rework order? Each correct answer presents pan of the solution.
NOTE: Each correct selection is worth one point.

  • A. Delete all route operations except for a half an hour stirring operation.
  • B. Add 20 grams of sugar to the production formula.
  • C. Delete all items from the production formula except for 20 grams of sugar.
  • D. Manually reserve batch 120008 after estimating the batch order.
  • E. Add a route operation for 0.5 run time hours of stirring.

Answer: A,B,E

Explanation:
Explanation
The correct answer is B, C, and E.
Here is the explanation:
To rework a batch order in Dynamics 365 Supply Chain Management, you need to create a new batch order and set the Rework batch toggle to Yes1. You also need to select the Batch number of the original batch that needs to be reworked1. The new batch order will have only one formula line that represents the original batch, and no route operations1.
To add 20 grams of sugar and stir the product for an additional 0.5 hours, you need to do the following actions on the rework order:
Add 20 grams of sugar to the production formula. You can do this by clicking on the Formula option on the All production orders form and adding a new formula line for sugar with a quantity of 20 grams1. You can also specify the ingredient type for sugar, such as Compensating or Filler2.
Add a route operation for 0.5 run time hours of stirring. You can do this by clicking on the Route option on the All production orders form and adding a new route operation for stirring with a run time of 0.5 hours1. You can also specify the resource or resource group that will perform the stirring operation3.
Delete all route operations except for a half an hour stirring operation. You can do this by clicking on the Route option on the All production orders form and deleting any existing route operations that are not related to stirring1. This way, you can avoid unnecessary steps and costs for the rework order.


NEW QUESTION # 48
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Product Master
Configuration
Constraint-based configuration
The Constraint-based configuration configuration technology can only be defined if the configuration dimension is the only active dimension on the product dimension group.
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/set-up-maintain-product-configuration-model


NEW QUESTION # 49
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 50
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
The solution does not meet the goal. Here is the explanation:
To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the lotion and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models


NEW QUESTION # 51
A company uses distributed hybrid topology within their Dynamics 365 Supply Chain Management system.
The company plans to build a manufacturing plant on a mountain to be closer to a required mineral source.
Internet connectivity is unreliable, and availability of bandwidth speed is limited. The company plans to deploy an operational edge scale unit for the plant to address the connectivity issue.
You need to determine where production operations can be performed.
Which method should you recommend?
To answer, drag the appropriate methods to the correct requirements. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
To determine where production operations can be performed, you should recommend the following methods:
Record the start of production: You should recommend the Production floor execution interface method. This method allows workers to register their daily work, such as when they start a job, report feedback about jobs, register indirect activities, and report absence1. Workers can use the production floor execution interface to sign in with their badge IDs and select the jobs that they want to start from the All jobs tab1. They can also view the details and instructions for each job, and report good quantities and scrap1.
Report the number of production units completed and finished goods put away: You should recommend the Production floor execution interface and Warehouse Management mobile app methods. These methods allow workers to report the completion of production jobs and the movement of finished goods to inventory. Workers can use the production floor execution interface to complete a job by selecting it from the Active jobs tab and tapping Complete1. They can also print labels for the finished goods if required2. Workers can use the Warehouse Management mobile app to scan or enter license plates for the finished goods and put them away in a location3. They can also perform other warehouse operations, such as picking, packing, receiving, and cycle counting3.
Report time spent training a new employee about line operation: You should recommend the Production floor execution interface method. This method allows workers to register indirect activities that are not related to a specific production job, such as training, meetings, or maintenance1. Workers can use the production floor execution interface to register an indirect activity by tapping Indirect activity on the toolbar and selecting an activity type from the list1. They can also enter a quantity or duration for the activity, and add a comment if needed1.
1: How workers use the production floor execution interface 2: Print labels 3: Install and connect the Warehouse Management mobile app


NEW QUESTION # 52
You need to modify the production order defaults for the manufacturing execution production order Start process.
What should you do? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 53
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. unmachined plastic pieces
  • B. excess plastic
  • C. machined plastic pieces
  • D. mold tooling

Answer: A,C

Explanation:
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other question on this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
Topic 3, Adventure Works
To start the case study
To display the first question on this case study, click the Next button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the Question button to return to the question.
Background
Adventure Works Cycles is a high-end bicycle manufacturer in North America. Their standard model bicycles are available year-round. Limited-edition bicycle models are released several times a year to boutique retailers domestically.
Adventure Works has had the most success with their limited-edition bicycles. These bicycles have high margins, are in high demand, and have a strong following with the younger generation biking community.
Current environment
General
Adventure Works expects to triple their manufacturing capabilities in the next few years due to increasing demand. The company plans to invest in Dynamics 365 Finance, Dynamics 365 Supply Chain Management, and the Power Platform products to migrate from a custom-built enterprise resource planning (ERP) solution and Microsoft Excel worksheets.
Adventure Works sells only to the United States and Canada. Despite their limited market, they cannot keep up with current demand. Over time, they want to expand their market to remain profitable.
Adventure Works has no capabilities or budget to undertake any development beyond Excel formula-level tasks.
Bicycle manufacturing
Bicycle models are measured and reported against how well a single model performs as a sum of all the variations of that model. For example, the Street Kid YOLO model sold 25,000 units in 2019 across all variations of the product, but the Purple Female frame made up 30 percent of that model's sales.
The Street Kid YOLO models sell in different volumes depending on the market.
The creation of production orders for bicycles occurs monthly and is based on historical sales.
Each part of a bicycle's assembly occurs at a different station in the Adventure Works production facility.
A piece of paper that has eight sections accompanies a bicycle throughout the manufacturing process. As each step is completed, the respective section is completed and signed off by a production worker.
The completed paper is used in the put-away process by the warehouse workers.
Financials
The standard model and limited-edition bicycle teams are separate operating units within the manufacturing division. Financials are tracked and reported separately even though they are produced and sold in the same sales channels.
Updates to the standard model bicycle models are created when a part for a bicycle becomes unavailable. This can change the cost of the product.
An updated model of a bicycle with new parts will be maintained as a new item and have a new price. However, it will look like the exact same product to retailers and distributors.
Manufacturing process
The bicycle manufacturing process is shown in the following graphic:

Limited-edition bicycle process
The limited-edition bicycles are made up of an Adventure Works custom frame with all other parts created by local artists and manufacturers.
Each bicycle has a unique set of new items that make up the bill of materials (BOM) because all parts are created to specification.
A single pilot limited-edition bicycle is created as a proof of concept.
Adventure Works occasionally reuses components from existing bicycles, but most limited-edition bicycles are made of handcrafted components designed to specifications.
Each limited-edition bicycle is built, and hand signed by a single Adventure Works artisan.
Sales price must be auto calculated after the cost price is derived.
Before creating the proof of concept limited-edition bicycle, the approximate sales price needs to be determined through a cost-plus 20 percent calculation.
All items except for the frame in the prototype process are considered finished items and can be sold individually.
The frame items require modifications in accordance with the manufacturing process as well as painting.
Each Adventure Works limited-edition bicycle artisan is scheduled to create a specific number of bicycles in a production run that must be completed by a certain date.
Limited-edition bicycle artisans work exclusively on a given run of limited-edition bicycles and are not able to work on other tasks.
Limited-edition bicycle BOM assembly process
The prototype process for the limited-edition bicycles is shown in the following graphic:

Requirements
General
Adventure Works will consist of three legal entities: the primary legal entity of the United States (AWUS), sales in Canada (AWCA), and an international expansion (AWIN).
AWIN must be able to sell only standard model bicycles.
AWUS and AWCA must be able to sell both standard model and limited-edition bicycles.
Warehouse workers must use the Warehouse Management mobile application to manage all inventory inbound and outbound from the warehouse.
Bicycle manufacturing
The handlebars, back wheels, and front wheels must not change for any of the bicycle model configurations.
Standard model bicycle production scheduling must be configured to start as soon as possible.
Bicycle components must be automatically reserved when the item is released to the production floor.
Standard model bicycle production must be automatically created on a predefined schedule.
As soon as bicycles are completed, they must be available to fulfill the backlog of orders.
Limited-edition bicycle production must be configured to meet the end date for when the bicycles must be completed.
Production orders need to track financials by standard model or limited-edition bicycle manufacturing teams.
The system must log the immediate consumption of BOMs for traceability.
All inventory is warehouse enabled.
Finished goods are reported as finished by the warehouse worker who picks up the finished product from the packaging area.
Finished products must automatically have put-away work completed for them.
New limited-edition bicycle process
Adventure Works is creating a new, limited-edition bicycle to commemorate the company's tenth anniversary. The limited-edition bicycle will be designed for charity events and be produced for the summer season.
The bicycle must be available in men's, women's, and unisex frame styles. It will be painted in one of 50 hand-painted designs representing the charity of the customer's choosing.
A limited run of 100 bicycles must be created.
The limited-edition bicycles must use the same production process as the standard model bicycles.
The limited-edition bicycles must use the same parts used for previous limited-edition bicycles, except for the unique paint colors.
Frames must be painted in-house.
Five painting options are available only in the unisex frame style.
New limited-edition bicycle orders
Customers must be able to place sales orders for the item in the chosen frame configuration, including style and color.
When an order for the new limited-edition bicycle is created, payment must be provided.
An approval for an order must exist for the order to be processed.
Upon approval of an order, production must start immediately and not require re-entry of data.


NEW QUESTION # 54
An automobile manufacturer leases cars to companies for use as company cars.
A car leased to a company breaks down and requires repairs.
You must open a maintenance request and replace the car with an equivalent model until the original car is repaired and returned to the company. When the manufacture' receives and inspects the car, the replacement car can be released to the company.
You need to select the maintenance request components to use.
Which components should you use? To answer, drag the appropriate components to the correct assets. Each component may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
Note: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 55
You need to set up the state control for sales of motorcycles.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create an inclusive restricted product list for United States. Do not add the motorcycle part to the list.
  • B. Create an inclusive restricted product list for United States and add the motorcycle part to the list.
  • C. Create an exclusive restricted product list for California and add the motorcycle part to the list.
  • D. Create an exclusive restricted product list for Missouri and add the motorcycle part to the list.

Answer: B,C

Explanation:
Reference:
https://stoneridgesoftware.com/working-with-restricted-products-in-dynamics-365-operations/


NEW QUESTION # 56
You need to determine the batch values on the combined mix batches for OperatorA.
Which values should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
A screenshot of a computer Description automatically generated


NEW QUESTION # 57
You need to configure the system to meet the requirements.
What should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 58
You need to configure the system for plastic operations.
Which two parts should be manually reported as finished? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. unmachined plastic pieces
  • B. excess plastic
  • C. machined plastic pieces
  • D. mold tooling

Answer: A,C


NEW QUESTION # 59
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.
The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.
You need to ensure that the system is set up to support the manufacturing process.
Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: A

Explanation:
Explanation
The solution does not meet the goal. Here is the explanation:
To ensure that the system is set up to support the process manufacturing of pain-relieving lotions, you should use the following steps1:
Create a product master for the lotion and release it to the relevant legal entities. On the Product dimension groups page, select Constraint-based configuration as the configuration technology, and select the configuration dimension. On the Released product details page, select Configurable on the Engineer tab.
Create a constraint-based product configuration model for the lotion and add it as a version to the product master. On the Constraint-based product configuration model details page, add attributes, constraints, subcomponents, BOM lines, and route operations to define the features and structure of the lotion. For example, you can add an attribute for ingredient A and specify its concentration as a value. You can also add constraints to limit the combinations of attribute values that are allowed.
Create a price model for the lotion and link it to the product configuration model. On the Price models page, add price components and specify how they are calculated based on attributes, subcomponents, BOM lines, or route operations. For example, you can add a price component for ingredient A and specify different prices for different concentrations.
Configure products on sales orders, sales quotations, purchase orders, or production orders by using the Product configuration models page. You can select values for attributes and see how they affect the price of the lotion. You can also view the price details and see how each price component contributes to the total price.
The solution in the question is not correct, because it does not involve constraint-based product configuration or price models. Creating a dimension-based product master with variants and using trade agreements to specify different pricing would not allow you to handle different concentrations of ingredients or calculate prices based on attributes.
1: Product configuration overview : Create constraint-based configuration : Price models


NEW QUESTION # 60
You need to resolve the issue for UserB.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Set up configuration and weight for partial visibility.
  • B. Set up configuration and weight for full visibility.
  • C. Create a catch weight item.
  • D. Create a product master with predefined variants for ounces and boxes.

Answer: B,C


NEW QUESTION # 61
You need to configure scheduling for each production area.
Which scheduling options should you use? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
A screenshot of a computer Description automatically generated


NEW QUESTION # 62
A company uses Dynamics 365 Supply Cham Management.
Several production orders are in the started status.
An issue with equipment causes a rollback in the production status tor some of the orders.
Some orders must be reset once the equipment is repaired, based on which products were being manufactured.
You need to reset the production orders based on the requirements
Which status should you use for each requirement? To answer, drag the appropriate statuses to the correct requirements. Each status may be used once, more than once, or not at all.
You may need to drag the split bar between panes or scroll to view content.

Answer:

Explanation:

Explanation
A close-up of a white background Description automatically generated


NEW QUESTION # 63
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 64
You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 65
......


Microsoft MB-335 (Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert) Certification Exam is designed to validate the skills and expertise of professionals in the field of supply chain management. Microsoft Dynamics 365 Supply Chain Management Functional Consultant Expert certification exam is intended for those who are responsible for configuring and implementing supply chain management processes and solutions using Microsoft Dynamics 365 for Finance and Operations.

 

MB-335 PDF Dumps Are Helpful To produce Your Dreams Correct QA's: https://www.itcertmagic.com/Microsoft/real-MB-335-exam-prep-dumps.html

100% Pass Guaranteed Download Microsoft Certified: Dynamics 365 Exam PDF Q&A: https://drive.google.com/open?id=1OJ0Q9YeSph4G-lkog-0e2SDxL6Cu6Ere