NEW QUESTION # 11
It is now January 2023. Your customer has loaded 3 years worth of shipment history (for 1/1/20 through 12/31/22) and wants to generate a monthly forecast for 2023 based on two years of shipment history.
When creating a demand plan, which two plan scope and demand plan options should your customer use? (Choose two.)

  • A. For demand plan option, add forecast shipments as forecasting profile, enter historical buckets as 24. and enter forecast buckets as 12.
  • B. For plan scope, select plan horizon as 12 months, forecasting calendar as Gregorian, and forecasting time level as month.
  • C. For demand plan option, add forecast shipments as forecasting profile, and enter historical buckets as 24.
  • D. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. enter history end date as 12/31/22. and enter forecast start date as 1/1/23.
  • E. For plan scope, select plan horizon days as 365. forecasting calendar as Gregorian, and forecasting time level as month.
  • F. For demand plan option, add forecast shipments as forecasting profile, enter history start date as 1/1/21. forecast start date as 1/1/23. and enter forecast end date as 12/31/23.

Answer: A,B


NEW QUESTION # 12
Your customer wants to be able to manually change the input values in purchase orders and transfer orders for the suggested plan recommendations. Which two recommendations are released by supply chain planning to Oracle Supply Chain Orchestration Cloud? (Choose two.)

  • A. Schedule planned orders for make, buy, and transfer of supplies
  • B. Reschedules of existing make, buy, and transfer supplies
  • C. New planned orders for make, buy, and transfer of supplies
  • D. Reschedules of sales orders, make, and buy

Answer: B,C


NEW QUESTION # 13
Which calendar is supported in the supply planning process but does not support bucketing by week?

  • A. Roman
  • B. Julian
  • C. Fiscal
  • D. Lunisolar
  • E. Gregorian

Answer: B

Explanation:


NEW QUESTION # 14
A major distributor experiences difficulty in establishing an inventory replenishment methodology. Which segmentation approach is not possible with Replenishment Planning?

  • A. to group items based on user-defined attributes and then assign a replenishment policy to each group
  • B. to group items based on item attributes for the product and customer dimensions and then assign a replenishment policy to each group
  • C. to group items based on similar global consumption levels and then assign a replenishment policy to each group
  • D. to group items based on similar consumption levels by warehouse and then assign a replenishment policy to each group

Answer: B


NEW QUESTION # 15
Which statement order is NOT true about how to effectively address demand at risk?

  • A. To maximize effort, use the Recommendations Summary graph and aim for a low number of recommendations with the associated at-risk demand value substantial enough to make a difference in demand fulfillment percentage.
  • B. Be aware that recommendations to expedite buy orders not only include purchase orders and requisitions, but also planned buy orders.
  • C. Recommendations appear in one of these five categories (or tabs): Expedite Buy Orders. Expedite Planned Orders. Expedite Transfer Orders. Add Resource Availability, and Add Supplier Capacity.
  • D. When you accept an expedite recommendation, the order is firmed by using the expedite date as the firm date. So when the plan is run after accepting the recommendation, the planning process assumes the supply is available on the firm date.

Answer: C


NEW QUESTION # 16
Which two statements are true about Production Scheduling? (Choose two.)

  • A. A resource's constraint mode has two choices: Relaxed and Constrained.
  • B. Refreshing a Production Schedule means that the schedule is being recalculated.
  • C. If a work order is not firm. Production Scheduling may schedule with an alternate resource.
  • D. Schedule options include: Configure Scope. Parameters, and View Settings.
  • E. Releasing a schedule can update Manufacturing Cloud work orders with revised dates, resources, release status, and work definitions.

Answer: C,D


NEW QUESTION # 17
You analyzed your customer's shipment history data at item and organization level. You found that the customer has many new products with limited history.
Does Planning Central support forecasting products with limited history, and what is this process called?

  • A. Yes, Planning Central supports the Holt Exponential Smoothing forecasting method used for newly introduced products.
  • B. Yes, Planning Central supports the Regression for Sparse Demand forecasting method, typically used for new products.
  • C. No, Planning Central does not support the Holt Exponential Smoothing forecasting method.
  • D. No, Planning Central does not support the Croston Method for Sparse Demand forecasting method.
  • E. No, Planning Central does not support the Regression for Sparse Demand forecasting method.

Answer: A


NEW QUESTION # 18
How can you deliver a forecast for drop shipments?

  • A. Create based on the drop shipment or booking history; the ship from will be the drop ship validation organization
  • B. Create based on the supplier performance for drop shipment collection
  • C. Excel upload using File Based Data Import Process
  • D. Generate manually using Planning Analytics
  • E. It cannot be done at this time.

Answer: A


NEW QUESTION # 19
You want to be able to filter your data by the planner code attribute on the item. Where can you go to do this?

  • A. Enable planner code on Planning Analytics page.
  • B. Configure Planning Analytics > Levels and Attributes tab
  • C. Configure Planning Analytics > Measure Catalog
  • D. The process "Add Levels and Attributes" must be run to associate new attributes.
  • E. The process "Associate Measure Catalog Attributes" must be run to associate new attributes.

Answer: A


NEW QUESTION # 20
A sales order containing a back-to-back item has been created. However, when you ran the supply plan in Planning Central, the supply for the sales order was not released. Why was the supply not released?

  • A. Only Global Order Promising and Supply Chain Orchestration can be used to release and create new supplies for back-to-back orders.
  • B. The supply plan should have been run in Supply Chain Orchestration, not Planning Central.
  • C. The supply must first be created in Global Order Promising and then it can be released from Planning Central.
  • D. Planning Central cannot create back-to-back supply, so the supply cannot be released.

Answer: A


NEW QUESTION # 21
Demand is high leading up to the Christmas holiday every year between Dec 20 and Dec 24 and not on Christmas day (Dec 25). Your customer has two demand plans. Describe the steps to model Christmas causal factor in both demand plans.

  • A. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • B. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 34. Causal factor upload to one demand plan will reflect in the 2nd demand plan also.
  • C. Open a demand plan and edit Christmas casual factor measure. Place value of one from Dec 20 to Dec 24 and zero for non-impacted days including Dec 25. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • D. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.
  • E. Open a demand plan and add a new customer specific Christmas causal factor. Create a table displaying the causal factor measure and relevant time period and modify as required. Causal factor changes in this demand plan will reflect in the 2nd demand plan also.
  • F. Use FBDI to create a new customer specific Christmas causal factor. Place value of 1 from Dec 20 to Dec 24. Causal factor changes are plan specific, so repeat the steps in the 2nd demand plan.

Answer: E

Explanation:
Reference:


NEW QUESTION # 22
What is one method of associating a Safety Stock Quantity value to an item?

  • A. Upload the value using File Based Data Import (FBDI)
  • B. Enter your value in the Safety Stock Quantity column in the Items page.
  • C. Run the Safety Stock Quantity Update Process.
  • D. Enter your value in the Safety Stock Quantity Override column in the Items page.

Answer: B


NEW QUESTION # 23
Which feature is NOT available for Sales and Operations Planning plans?

  • A. View Segmentation Summary
  • B. Load Planning Data from Files
  • C. Collect Planning Data
  • D. Configure Exceptions

Answer: D


NEW QUESTION # 24
As part of the agreement with one of your suppliers, you must always order product by the 100s. For example, if the required supply is 105, you must order 200, if it's 275, you must order 300. Which item attributes will help you achieve this?

  • A. Maximum Order Quantity
  • B. Fixed Lot Size Multiplier
  • C. Minimum Order Quantity
  • D. Rounding
  • E. Fixed Order Quantity

Answer: B


NEW QUESTION # 25
Which is the correct sequence of possible solutions that a constrained plan might consider when attempting to resolve a capacity or resource overload?

  • A. First alternate item structures, and work definitions, then substitute components, then alternate resources, and finally, alternate suppliers and source organizations.
  • B. First alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.
  • C. First alternate suppliers, then alternate resources, then substitute components, then alternate work definitions and item structures, and finally, alternate source organizations.
  • D. First subscribe components, then alternate resources, then alternate work definitions and item structures, and finally, alternate suppliers and source organizations.

Answer: B


NEW QUESTION # 26
Which two statements are true about the seeded (predefined) Contract Manufacturing roles? (Choose two.)

  • A. Users with the Supply Chain Operations Manager role need access to the Supplier Portal to see their updates and what's in progress.
  • B. Users with the Contract Manufacturer role can access the Supplier Portal to upload their production updates.
  • C. Users with the Supplier Inventory Manager role can access the Supplier Portal.
  • D. Users with the Supplier Inventory Manager role don't need access to the Supplier Portal because they already have access to the Supply Chain Collaboration work area.
  • E. Users with the Supply Chain Operations Manager role can access the Supply Chain Collaboration work area.

Answer: C,E


NEW QUESTION # 27
Identify two ways you can track performance against goals when defining measure goals. (Choose two.)

  • A. Attribute
  • B. Specification
  • C. Value
  • D. Aggregation
  • E. Range
  • F. Quantity

Answer: A,C


NEW QUESTION # 28
When duplicating a supply plan, which parameters can you modify if Copy Type is "copy plan options only"?

  • A. Name, Description. Access. Supply Planning Mode, and Owner
  • B. Name, Description. Access. Owner. Include Archive, and Notes
  • C. Name, Description. Access (but if the original plan was private, you can't edit the Users list), and Notes
  • D. Name, Access. Owner, and Notes

Answer: D


NEW QUESTION # 29
......


Oracle 1z0-1066-23 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Applying Forecasting Methods, Causal Factors, and then Evaluating Results
  • Apply Item Attributes for Supply Planning
Topic 2
  • Configuring UOM, Currency, Disaggregation and Conditional Formatting
  • Deploying Multi-Dimensional Demand Segments
Topic 3
  • Configure Planning Analytics
  • Configure Replenishment Planning
  • Costing and Inventory Foundations
Topic 4
  • Configuring Pages, Tilesets, Tables and Graphs
  • Configure, Run and Manage a Demand Plan
Topic 5
  • Supply Planning Collaboration
  • Sales and Operations Planning
  • Configure Safety Stock Plan options
Topic 6
  • Evaluate and Execute Simulations
  • Contract Management Collaboration
  • Inventory rebalancing via clustering
Topic 7
  • Planning for Counter Sales Orders
  • Integrate S&OP with SCM Cloud and External systems

 

Positive Aspects of Valid Dumps 1z0-1066-23 Exam Dumps!: https://www.itcertmagic.com/Oracle/real-1z0-1066-23-exam-prep-dumps.html

First Attempt Guaranteed Success in 1z0-1066-23 Exam: https://drive.google.com/open?id=11_qd30Zkez8phMi_kqOcs3bkxcBfqqN2