Enhance Your Career With Available Preparation Guide for SAFe-SPC Exam [Q67-Q91]

Share

Enhance Your Career With Available Preparation Guide for SAFe-SPC Exam

Get Special Discount Offer of SAFe-SPC Certification Exam Sample Questions and Answers


Scaled Agile SAFe-SPC Exam Syllabus Topics:

TopicDetails
Topic 1
  • Customer-Centricity and Design Thinking
  • Thriving in the Digital Age and Business Agility
Topic 2
  • Building a Culture of Continuous Learning
  • Establishing Organizational Agility
Topic 3
  • Organizing Agile Release Trains along Value Streams
  • Aligning Portfolios with Corporate Strategy
Topic 4
  • Prioritizing ART Backlogs
  • Building Solutions with Agile Product Delivery
Topic 5
  • Training and Team Coaching
  • Launching More ARTs and Value Streams
Topic 6
  • Cross-functional Agile Teams
  • Embedded Quality

 

NEW QUESTION # 67
Capabilities are similar to Features and can be managed in the Program Backlog.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 68
Which of the following is a reason to manage Epic flow with the Portfolio Kanban?

  • A. It removes the need to analyze Epics
  • B. It creates a container for work to be visible
  • C. It enables independent decision-making by stakeholders
  • D. It brings structure to decision-making

Answer: D

Explanation:
Managing Epic flow with the Portfolio Kanban brings structure to decision-making by providing a visual and managed process for reviewing, analyzing, and approving Epics. It enables stakeholders to make transparent, data-driven decisions about portfolio-level investments.
References:
SAFe 6.0, "Portfolio Kanban" article
SPC 6.0 Guide, "Exploring Lean Portfolio Management"


NEW QUESTION # 69
Which activity occurs during the management review and problem-solving meeting at the end of the first day of PI Planning?

  • A. ROAMing risks
  • B. Review the team's plans and make appropriate changes
  • C. Negotiating scope changes
  • D. Assigning business value to the teams' draft PI Objectives

Answer: B

Explanation:
At the end of day one of PI Planning, a management review and problem-solving meeting is held. During this meeting, management reviews the teams' draft plans and makes any necessary changes to ensure alignment and address issues such as scope, resources, and dependencies before teams finalize their plans on day two.
References:
SAFe 6.0, "PI Planning" (Management Review and Problem-Solving)
SPC 6.0 Guide, "Launching an Agile Release Train"


NEW QUESTION # 70
What does the SAFe budgeting model suggest?

  • A. Epics, Features, and Stories are funded based on their size in normalized Story points, while teams are
    allocated to high-priority work as needed.
  • B. Each Value Stream receives budget allocation as a whole; individual work is not specifically budgeted.
  • C. Each Strategic Theme receives a budget allocation when Strategic Themes span portfolios.
  • D. Each team gets budget allocation and Features are funded according to their size in normalized Story points.

Answer: B


NEW QUESTION # 71
What responsibilities are associated with the System Team?

  • A. Defining Solution architecture.
  • B. Creating new automated test scenarios.
  • C. Deploying to staging.
  • D. End-to-end system testing.
  • E. Building and maintaining a production-equivalent staging environment.

Answer: D


NEW QUESTION # 72
(Select 2) The SAFe Economic Framework guides Value Stream investment decisions by: __________.

  • A. Finding Value Streams.
  • B. Prioritizing work by ROI.
  • C. Requiring lightweight business cases for Epics.
  • D. Empowering the Product Owners to sequence the Value Stream Backlog.

Answer: B,C

Explanation:
The SAFe Economic Framework supports investment decisions through:
Prioritizing work by ROI (A): Economic prioritization techniques (such as WSJF or ROI) ensure the highest value work is prioritized.
Requiring lightweight business cases for Epics (B): This ensures sound economic reasoning and justification before large investments are made.
Empowering Product Owners to sequence the Value Stream Backlog (C) is not a portfolio-level economic framework action. Finding Value Streams (D) is part of the implementation roadmap, not ongoing investment decisions.
"The Economic Framework guides decisions by requiring business cases and prioritizing work using economic factors such as ROI." (Source: SAFe 6.0 Framework: Economic Decision Making; SPC 6.0 Guide "Exploring Lean Portfolio Management")


NEW QUESTION # 73
You are working with an ART that is preparing for their first PI Planning event. All Features are formulated and ready for WSJF prioritization. However, when you look over the list of Features, it turns out that they are big tasks rather than Features.
What technique would be useful to fix the list of backlog items to be able to apply WSJF?

  • A. Formulate business benefits for each backlog item. If no meaningful business benefits can be identified, it's not a Feature and should be redefined.
  • B. Split the backlog items into smaller, more manageable pieces of work and rearrange them into real Features.
  • C. Identify the associated Epics when formulating Features.
  • D. Build explicit dependencies between backlog items. If B depends on A for completion, make sure that the opportunity enablement WSJF is a parameter of A.

Answer: B

Explanation:
Features in SAFe should be right-sized, delivering value and being small enough for incremental delivery within a PI. If the current backlog items are too large ("big tasks"), the best technique is to split them into smaller, more manageable Features. This enables meaningful WSJF prioritization and supports flow-based delivery.
References:
SAFe 6.0 Website: Features and Capabilities
SPC 6.0 Guide: "Right-size Features to fit within a PI for effective prioritization and delivery."


NEW QUESTION # 74
What are stretch objectives?

  • A. Objectives that are beyond the capacity of the team and so are uncommitted for the PI.
  • B. Objectives that are identified during the PI.
  • C. Objectives that the business has promised to their Customers.
  • D. Objectives that are part of the team's capacity but not necessarily achievable during the PI.

Answer: A

Explanation:
Stretch objectives are those that teams would like to accomplish but are not certain they will be able to complete within the PI due to uncertainty, risks, or dependencies. These objectives are not included in the team's committed objectives and do not count towards the team's PI predictability measure.
SAFe 6.0 states:
"Stretch objectives are used to identify work that can be done if capacity permits, but are not committed by the team for the PI." References:
SAFe 6.0 Website: PI Objectives
SPC 6.0 Guide: "Stretch objectives are not part of the team's commitment and may or may not be achieved in the PI."


NEW QUESTION # 75
(Select 2) SAFe teams using Kanban are required to participate in which events?

  • A. System Demo
  • B. Iteration Planning
  • C. Iteration Retrospective
  • D. PI Planning

Answer: A,D

Explanation:
While Kanban teams in SAFe may not participate in all Scrum-based ceremonies (such as Iteration Planning and Retrospectives), they are required to participate in System Demos and PI Planning. This ensures alignment, synchronization, and integration at the ART and Program level.
"Kanban teams participate fully in ART ceremonies that require alignment and system integration, such as PI Planning and System Demos." (Source: SAFe 6.0 Framework: Team Kanban; SPC 6.0 Guide, "Building Solutions with Agile Product Delivery")


NEW QUESTION # 76
What is NOT the responsibility of the Enterprise Architect?

  • A. Synchronize the technology stack and infrastructure across Value Streams.
  • B. Facilitate reuse of ideas and proven design patterns.
  • C. Define the Solution design for Agile Release Trains.
  • D. Drive the strategy for maintaining the Enterprise's architecture.

Answer: C

Explanation:
Enterprise Architects focus on cross-ART and cross-Value Stream strategy and technical alignment. Defining Solution design for Agile Release Trains (C) is the responsibility of Solution/System Architects at the ART or Solution Train level, not Enterprise Architects.
"Enterprise Architects define and communicate a shared technical and architectural vision for the enterprise.
Solution and System Architects design at the ART/Solution Train level." (Source: SAFe 6.0 Framework: Enterprise Architect, Solution Architect)


NEW QUESTION # 77
Backlog items in an Expedite class of service can break WIP limits.

  • A. True
  • B. False

Answer: A

Explanation:
"Expedite" is a Kanban class of service for critical items that require immediate attention. SAFe permits items in the Expedite lane to override or break WIP (Work In Process) limits to ensure urgent delivery.
"Expedite items are allowed to break WIP limits to ensure that urgent issues are addressed as quickly as possible." (Source: SAFe 6.0 Framework: Kanban Classes of Service)


NEW QUESTION # 78
What is the key reason for deploying each team increment to the production-equivalent staging environment?

  • A. Teams can verify whether new functionality or Nonfunctional Requirements are compatible with the
    current production configuration.
  • B. If something goes wrong with the production environment, teams can switch their staging to perform the role of production.
  • C. It enable SAFe teams to Develop on Cadence and Release Any Time.
  • D. It allows the System Team to test the deployability of the Solution.

Answer: C


NEW QUESTION # 79
(Select 2) What are the right scenarios for using SAFe Foundations Training Materials?

  • A. Train Scrum Masters in servant leadership following "SAFe for Teams" training.
  • B. Familiarize Release Train Engineers with the PI Planning process.
  • C. Train the teams prior to PI Planning.
  • D. Familiarize executives with SAFe.
  • E. Make an initial presentation on SAFe to the organization.

Answer: D,E

Explanation:
SAFe Foundations Training Materials are designed for broad awareness and initial education, especially for:
B: Making an initial presentation on SAFe to the organization.
D: Familiarizing executives and leaders with the basics of SAFe.
Detailed role-based and process training (A, C, E) is better addressed through role-specific courses (e.g.,
"SAFe for Teams," "SAFe Scrum Master," "SAFe Release Train Engineer").
References:
SAFe 6.0 Website: SAFe Foundations
SPC 6.0 Guide: "Foundations materials are ideal for executive briefings and initial organizational awareness."


NEW QUESTION # 80
(Select 2) What steps in the Portfolio Kanban are most appropriate for running research spikes?

  • A. Portfolio Backlog-run a spike before pulling into development.
  • B. Implementing-teams perform spikes as usual
  • C. Analysis-spikes help clarify feasibility.
  • D. Funnel-understand whether the Epic makes sense.

Answer: C,D

Explanation:
A: During the Analysis step, research spikes (time-boxed investigations) are used to clarify feasibility, identify unknowns, and gather data for decision making.
C: In the Funnel step, early research or spikes help determine if the Epic is even worth advancing, especially for innovations or high-risk items.
Portfolio Backlog (D) is for items already accepted for future implementation; it's generally too late for basic research spikes. Implementing (B) is for execution, not discovery.
References:
SAFe 6.0 Website: Portfolio Kanban
SPC 6.0 Guide: "Spikes are often run during the Funnel and Analysis steps to clarify scope, feasibility, and business case."


NEW QUESTION # 81
Velocity is a good measure of team performance.

  • A. False
  • B. True

Answer: A


NEW QUESTION # 82
When does the System Demo happen?

  • A. On demand.
  • B. After continuous integration.
  • C. After the Solution Demo, but before PI Planning.
  • D. After every Iteration.
  • E. After Pre-PI Planning.

Answer: D


NEW QUESTION # 83
(Select 3) Based on the work of Don Reinertsen, SAFe denotes five primary economic factors that can be used
to consider the economic perspective of a particular investment. From the list below, choose three of those
primary economic factors.

  • A. Risk
  • B. Value stream budget
  • C. Lead time
  • D. Development expense
  • E. Return on Investment (ROI)

Answer: A,C,D


NEW QUESTION # 84
What is Cost of Delay?

  • A. Penalty for nonperformance.
  • B. Opportunity cost and deferred revenue.
  • C. Cost of not addressing risk early on.
  • D. Cost incurred when system integration appears too late in the PI.

Answer: B

Explanation:
Cost of Delay is the economic impact of delaying or deferring work. It combines opportunity cost and potential revenue lost due to not delivering value sooner. It is a key metric for prioritizing work in SAFe.
References:
SAFe 6.0 Website: WSJF and Cost of Delay


NEW QUESTION # 85
(Select 3) Which behaviors are typically associated with Lean-Agile Leaders?

  • A. Protect subordinates from interference by outside stakeholders.
  • B. Support decentralized decision-making.
  • C. Emphasize lifelong learning.
  • D. Establish clear objectives for managing.
  • E. Develop Solutions.

Answer: B,C,D

Explanation:
Lean-Agile leaders in SAFe are characterized by:
A: Establishing clear objectives, providing clarity and direction.
D: Supporting decentralized decision-making, empowering teams.
E: Emphasizing lifelong learning, modeling and fostering a growth mindset.
Leaders do not directly develop solutions (B)-that's the teams' responsibility. Protecting subordinates from all outside influence (C) is not Lean-Agile leadership; instead, leaders encourage collaboration and openness.
References:
SAFe 6.0 Website: Lean-Agile Leadership
SPC 6.0 Guide: "Lean-Agile leaders provide vision, enable autonomy, and model learning."


NEW QUESTION # 86
Typically, SAFe prioritizes Capabilities based on which of the following?

  • A. Business value
  • B. CoD (Cost of Delay)
  • C. Capacity allocation according to budget
  • D. WSJF (Weighted Shortest Job First)

Answer: D


NEW QUESTION # 87
When is the Solution Demo conducted?

  • A. On demand.
  • B. Mid-PI.
  • C. At the end of each PI.
  • D. At the end of each Sprint.

Answer: C

Explanation:
The Solution Demo is conducted at the end of each Program Increment (PI) and demonstrates the integrated work of multiple ARTs in a Solution Train. This ensures the solution increment meets requirements and allows for stakeholder feedback.
References:
SAFe 6.0 Website: Solution Demo
SPC 6.0 Guide: "The Solution Demo is held at the end of each PI to show integrated solution increments."


NEW QUESTION # 88
The User Experience (UX) team does not believe in Agile development. They say, "We have to understand the
full behavior of the eventual system in order to be able to define an effective user experience. We don't work
in timeboxes.
How would you respond?

  • A. It's important to have an overall user experience vision before implementation, but the vision can be implemented iteratively for early feedback.
  • B. Just like system architecture, the entire user experience should be fully designed before an
    implementation.
  • C. User experience is indeed a different concept and the team should be exempt from working in Iterations.
  • D. Since the team is working in timeboxes, this has been proven to be the most effective way to implement
    the user experience.

Answer: A


NEW QUESTION # 89
The User Experience (UX) team does not believe in Agile development. They say, "We have to understand the full behavior of the eventual system in order to be able to define an effective user experience. We don't work in timeboxes.
How would you respond?

  • A. Since the team is working in timeboxes, this has been proven to be the most effective way to implement the user experience.
  • B. It's important to have an overall user experience vision before implementation, but the vision can be implemented iteratively for early feedback.
  • C. Just like system architecture, the entire user experience should be fully designed before an implementation.
  • D. User experience is indeed a different concept and the team should be exempt from working in Iterations.

Answer: B

Explanation:
SAFe recognizes the importance of an overarching UX vision but emphasizes that implementing this vision iteratively-just like architecture-is critical. This enables fast feedback and adaptation based on user needs and evolving solution context. UX is not exempt from Agile principles; rather, UX design and research should proceed collaboratively with incremental delivery.
"While a UX vision is important, Agile teams work best when they implement that vision incrementally, with each iteration providing feedback to enhance the user experience." (Source: SAFe 6.0 Framework: Agile Teams and UX; SPC 6.0 Guide, "Building Solutions with Agile Product Delivery")


NEW QUESTION # 90
(Select 3) What are the primary reasons to limit WIP?

  • A. Reduce multiplexing
  • B. Expand context switching
  • C. Decrease wait times
  • D. Increase throughput
  • E. Make it easier to visualize the important work

Answer: A,C,D

Explanation:
Limiting WIP:
Reduces multiplexing (A): Teams and individuals do less context switching and focus more.
Decreases wait times (B): Items flow through the system faster with less time spent waiting.
Increases throughput (E): Limiting WIP ensures more items complete in a given period.
"Limiting WIP decreases wait times, reduces context switching (multiplexing), and increases throughput." (Source: SAFe 6.0 Framework: Principle #6 - Visualize and limit WIP, reduce batch sizes, and manage queue lengths.)


NEW QUESTION # 91
......

Updated SAFe-SPC Dumps Questions Are Available For Passing Scaled Agile Exam: https://www.itcertmagic.com/Scaled-Agile/real-SAFe-SPC-exam-prep-dumps.html

New SAFe-SPC Dumps For Preparing SAFe Practice Consultant Certified Scaled Agile Exam Well: https://drive.google.com/open?id=1s_VC5eA8C0ESy-ZRO8YEMB8ALz71X_Ty